Airport and AerobridgesManufacturing. Refurbishment.

AD McCallum & Son aerobridge manufacture and refurbishment - Sydney, Australia

ADM - servicing the Australian Airport Industry

ADM has 17+ years experience servicing the Australian airport industry including aerobridge manufacture and refurbishment. We specialise in aerobridge installation, maintenance, repairs and relocations.

  • Manufactured and installed Virgin Aerobridge access walkways to Virgin planes at Gates 31 and 32 - Sydney Domestic Airport
  • Relocated and refurbished 10 x aerobridges at Sydney International Terminal and 6 x Ansett Aerobridges at the Domestic Terminal. Transported them to ADM workshop for full refurbishment including electrical, hydraulic, paint, carpet and tile work before returning them to Mascot and installing
  • Refurbished and carried out major work to Sydney Airport aerobridges in time for the Sydney 2000 Olympics
  • Upgraded the Sydney International Terminal for the arrival of the A380 Airbus and was a major part of the refurbishment of T1 and T2 during 2006 and 2007
  • We also manufactured the A380 mock up test rig which was used for training of airport staff in the safe positioning of aerobridges against the new A380 Airbus



Click image above to view gallery



Call ADM on +61 2 4575 1922 for Aerobridge servicing, maintenance and repairs Australia-wide.

AD McCallum, celebrating 60 years
AD McCallum robotic welding

Introducing AD McCallum and Son's MA2010 Robot on 3.15m track fitted with Fronius TPS/i 500amp welder. For even higher welding performance call ADM on 02 4575 1922

 

ADM:

  • DESIGN +

    Market-leading Engineering Design. 2D + 3D CAD. 3D Prototypes. View Services
  • MANUFACTURING +

    3 generations of experience providing manufacturing services Australia-wide View Services
  • MAINTENANCE +

    Precision maintenance and repairs to all types of structural, hydraulic, pneumatic and mechanical equipment View Services
  • SANDBLASTING + SPRAY PAINTING +

    Professional abrasive blasting and industrial spray painting services, small and large jobs View Services
  • ROPS & FOPS +

    CERTIFIED DESIGN of ROPS and ROPS/FOPS canopies for all types of earthmoving equipment and weights. In-house comprehensive DESTRUCTIVE TESTING View Services
  • CRANES +

    Crane repairs, manufacture, maintenance, inspections, new auxilary equipment and modernisation services View Services
  • AEROBRIDGES +

    17+ years experience in Manufacturing and Refurbishment for the Australian airport industry View Services
  • 1

ENQUIRIES

- Terminal 1, Bay 54, Sydney International Airport
  • Shop manufacture 1 x 10m static link on two columns
  • Excavate new rotunda and column footings - 6m x 5m x 1m
  • Erect rotunda column sent from Los Angeles, USA to our Wilberforce workshop for modifications and completion
  • Fabricate steel pipe bollards around all columns and rotunda
TIMING:

11/10/12 - 14/12/12

RESULT:

Completed on time + on budget

  • 1/19: Completed static link being moved to our sandblasting facility
  • 2/19: Static link sandblasted, painted in 2 Pak, ready for sheeting and lining
  • 3/19: Static link externally sheeted
  • 4/19: Concrete cutting of new footings
  • 5/19: Excavation of footings
  • 6/19: Footings excavated, drilling starter bar holes
  • 7/19: Lifting reo bars into footings
  • 8/19: Electrical conduits and hold down nest of bolts in footing
  • 9/19: Lifting of static link onto columns
  • 10/19: Static link in place on two columns ready to lift rotunda and rotunda column into position
  • 11/19: Rotunda and rotunda column being lifted into position
  • 12/19: ADM work vehicles and scissor lift in use
  • 14/19: Static link and rotunda in position ready for positioning of aerobridge
  • 14/19: Static link and rotunda in position ready for positioning of aerobridge
  • 15/19: Static link and rotunda in position ready for positioning of aerobridge
  • 16/19: Safety barrier bollards installed around the three columns
  • 17/19: Aerobridge installed and having final inspection before commissioning ready for operation
  • 18/19: Bay 54 T1 in operation
  • 19/19: Bay 54 T1 in operation